Hebei Nailiang Machine Equipment Co., Ltd.
|
Price: | 6800.0 USD |
Payment Terms: | T/T,L/C,D/A,D/P,WU,Paypal,Money Gram |
Place of Origin: | Hebei, China (Mainland) |
Add to My Favorites | |
HiSupplier Escrow |
NL 180 Crawler Drilling Rig Self Introduction
The drilling depth is 180m, the drilling diameter is 105-180mm, the lifting force is 16t, the tower height is 3M, and the whole machine weight is 4.5t, It adopts the rubber track design, which has the advantages of low noise, no damage to the road, less vibration and high speed.
NL 180 Crawler Mounted Drilling Rig Tech Data
NL 180 Crawler Mounted Drilling Rig | |||
Item NO. | NL-180 | Air consumption(m³/min) | 17-31 |
The Weight(T) | 4.5 | Equipped capacitor(Kw) | 55 |
Dimensions(mm) | 3800*1550*2350 | Swing speed(rpm) | 45-65 |
The hole diameter(mm) | 140-254 | Swing torque(N.m) | 3200-4600 |
Drilling Depth(m) | 180 | Drill pipe diameter(mm) | 76 89 |
Once-time advance length(m) | 3.3 | Drill pipe length(m) | 1.5 2.0 3.0 |
Walking speed(Km/h) | 2.5 | Rig lifting force(T) | 10 |
Climbing angles(Max.) | 30 | sopporting Power | 29m3/min 23BAR AIR COMPRESSOR |
Using air pressure(Mpa) | 1.7-2.5 |
NL 180 Crawler Mounted Drilling Rig Advantages
1. The pneumatic impact principle is adopted, and the drilling footage is fast
2. Equipped with rubber steel wire crawler, it is easy to move and does not hurt the road when walking on urban roads.
3. Equipped with high hydraulic outrigger, it is convenient for loading and unloading vehicles, saves hoisting costs, and can be used for leveling of drilling rig to maintain the stability of the fuselage.
4. Equipped with high-power diesel engine, it has strong power and can effectively meet the needs of work.
5. Equipped with hydraulic take-off and landing compound boom, it saves space and provides strong lifting force for deep hole
NL 180 Crawler Mounted Drilling Rig
Q 1: What kind of drilling rig do you have?
A: We mainly produce small hydraulic drilling rig, water well drilling rig, core drilling rig, engineering drilling rig, geological exploration drilling rig, etc., and we will recommend the suitable model according to your exact requirement .
Q 3: Are you a manufacturer or a trading company?
A:We are a 20 years professional manufacturer with ISO certificate. We have a large modern drilling rig plant in Hebei, China.
Q 4: How long is your delivery time?
A: Small hydraulic drilling rigs generally take 5-7 days, and large model will take 7-15 days.
If there is an urgent order, please contact our sales in advance.
Q 5: How long is the warranty of your well drilling rig?
A: Except for consumable spare parts, the whole machine 12 months.