Hebei Nailiang Machine Equipment Co., Ltd.
|
Price: | 6800.0 USD |
Payment Terms: | T/T,L/C,D/A,D/P,WU,Paypal,Money Gram |
Place of Origin: | Hebei, China (Mainland) |
Add to My Favorites | |
HiSupplier Escrow |
350 Water Well Drilling Rig Introduction:
It is suitable for industrial and civil drilling and geothermal drilling. It has the advantages of large drilling diameter, deep drilling, fast footage, flexible movement and so on
NL350 Water Well Drilling Rig Technical Data:
Product Name | NL350 |
Power Type | Diesel |
Place of Origin | China |
Brand Name | SHITAN |
Usage | Water Well Drilling Rigs |
Dimension(L*W*H) | 6400MM*2250MM*2700MM |
Weight Of Machine | 8.9 T |
Certification | ISO9000 |
Warranty Time | 12 Months |
Color | Blue,red ,yellow |
Drilling diameter | 152mm-305mm |
Depth | 25M |
Rotary speed | 0-90rpm |
DTH | K40 |
Drilling Rods | 76*2m+76*3m |
Air consumption | 13-20m3/min |
Travelling speed | 0-2.5km/h |
NL350 Water Well Drilling Rig Main Features:
1. five speed manual integrated gearbox, hydraulic release bearing and full synchronizer
2. mechanical winch, which has fast lifting speed and is easy to deal with bottom hole accidents.
3. excellent off-road performance, especially in muddy areas.
4. four high-strength hydraulic legs, with a maximum support height of 1.5m,
In the drilling process of water well drilling rig,what should we pay attention to?
Bit plays a very important role in the drilling of water well drilling rig, but the quality of a bit directly affects the efficiency and quality of water well drilling. Therefore, in the selection process, we should pay attention to the selection and use of lower bit. When we are operating the drill bit, we must pay attention to several aspects in order to better production and operation.
1. After the drilling structure of the drill bit of the water well drilling rig is drilled, the central drilling tool needs to be replaced in time. First, the hole bottom needs to be cleaned, and then the residue at the hole bottom needs to be blown away. After the drill bit stops rotating, the drilling tool in the water well drilling rig can be lifted up slowly. When the lifting force is just enough to lift the drilling tool, it is the most appropriate.
2. During the drilling process, the drill bit of the water well drilling rig shall be summarized. It is also necessary to carefully observe the follow-up situation of the casing, timely understand the specific situation in the hole, and keep the hole clean when necessary. Moreover, the drill bit in the water well drilling rig shall not be pulled out by force during the drilling process.
3. Sometimes there will be more residual rock slag at the bottom of the hole of the water well drilling rig, and the rotating part of the eccentric bit will be stuck by the rock slag, which will affect its retraction and production. At this time, it is necessary to transport air pressure, clean the hole again, make the DTH hammer work in a short time, and then lift the central drilling tool again.