Hebei Nailiang Machine Equipment Co., Ltd.
|
Price: | 6800.0 USD |
Payment Terms: | T/T,L/C,D/A,D/P,WU,Paypal,Money Gram |
Place of Origin: | Hebei, China (Mainland) |
Add to My Favorites | |
HiSupplier Escrow |
NL260 Water Well Drilling Rig Description
NL-260 drilling rig is especially suitable for water intake in mountainous and rocky strata.Pneumatic water well drilling machine should be used together with air compressor, it can add mud pump and foam pump. Need to use different drilling tools such as: drill rod, hammer, rock drill bits, etc.If you want to buy an air compressor at the same time, please tell us your drilling depth and diameter, and we will give the corresponding recommendation
NL 260 Water Well Drilling Rig Technical Information
Drilling Depth | 260m |
Dia.hole | φ105-260mm |
Advance Length one time | 6.6m |
Working pressure | 1.7-3.0MPa |
Air consumption | 17-35m³/min |
Length of rod | 1.5m,2m,3m,6m |
Dia. Of rod | φ76, φ89,φ102,φ114 |
Lifting power | 24T |
Rotation torque | 8500-11000N.m |
Rotation Speed | 40-70r/min |
Diesel Engine | Yuchai |
Engine Power | 85Kw/2200rpm |
Travelling speed | 0-2.5 Km/h |
Climb capacity | 30° |
Weight | 9000kgs |
Dimension | 5900x2000x2850mm |
Application | Complicated geological conditions:Rock,Mud,Sand etc. |
Drilling Way | Top drive hydraulic rotary and propulsion,Dth Drilling or Mud Pump Driling |
Dth Hammer | 4",5",6",8" Drill hammer or CIR110, 130, 150,170 |
NL 260 Water Well Drilling Rig Advantages
This is a high efficiency and multi-functional down the hole water well drilling equipment, It can be used to drill water well, agrecultural irrigation well, geothermal well and other type well holes. It is sepcial suitable for mountain area and rock stratum water sourcing project.
system. The brand diesel is protected by 2 levels air filtration systems and also can directly use the clean air from the air compressor.
The pneumatic drilling rig is multifunction, with different configurations suitable for different geologies.Accept customization,any good ideas please contact us, our engineers will help you get what you want, we can also put the platform on a truck mounted chassis
What can we do for you?
Q: Are you original manufacturer? A:Yes, we are a manufacturer in construction machinery and we have the whole series products
Q: What kind terms of payment can be accepted? A:Normally we can work on T/T.
Q: What about the delivery time? A:7 days after receiving the deposit.
Q: What about the warranty time? A:12 months after shipment,engine is 6 months.
Q: What about the Minimum Order Quantity? A:The MOQ is 1 set.
Q: Could you stick customers brand on the products? A: We warmly welcome the OEM orders.
Courtyard Drilling Attentions
1. Consider whether the well depth is reasonable
We should first investigate whether there are cables, sewers and other facilities under the ground, and avoid unnecessary damage.
2. Convenience, health and other issues should be considered.
After drilling the well, find some charcoal and throw it into the well with a bag and press it at the bottom of the well to absorb foreign toxins. After having water, you can put a few small fish down, which is a good way to test the safety of water quality.
3. The well should not be too deep. It should be above the ground and should be blocked with bricks and stones. It is better to have a cover, so as to prevent dirt from falling in, make people feel safer and avoid unnecessary dangers.