Hebei Nailiang Machine Equipment Co., Ltd.
|
Price: | 6800.0 USD |
Payment Terms: | T/T,L/C,D/A,D/P,WU,Paypal,Money Gram |
Place of Origin: | Hebei, China (Mainland) |
Add to My Favorites | |
HiSupplier Escrow |
NL180 Water Well Drilling Rig Introduction
NL 180 drilling rig can drill in hilly, mountainous and other rocky areas. It has the advantages of large drilling diameter, deep drilling, fast footage, flexible movement and so on. It has been used in industrial and civil drilling, geothermal drilling, environmental monitoring drilling and so on
NL 180 Water Well Drilling Rig Technical Data
Drilling Rig Model | NL-180 | ||
working wind pressure(Mpa) | 17-31 | ||
Weight | 4500kg | ||
Hole diameter(mm) | 180mm | ||
Cost effective drilling depth(m) | 180m | ||
Feeding stroke(mm) | 3000 | ||
Length of drill pipe(mm) | 3m | ||
Diameter of drill pipe(mm) | Φ76 | ||
Maximum hoist capacity(N) | 35000 | ||
Climb ability(°) | 30 | ||
Walking speed(km/h) | 1~3 | ||
Rotating speed(r/min) | 0-96 | ||
Rotating torque(N.m) | 2100 |
NL 180 Water Well Drilling Rig Features :
1.180m DTH Crawler Mounted Well Drilling Rig is compact, and its width is only 1.3m, suitable for narrow drilling condition,
2.Perfect Maneuverability with hydraulic control.
In order to fulfill various application cases, the main parameters of drill can be adjusted, such as rotation speed, torque, feeding pressure anti-feeding pressure, feeding speed, lifting speed.
3.Rotation, feeding, lifting by Top driven.Easier for rod changing, reducing rod changing time, better for follow – down drilling.
4. Multi-functional drillingMultiple drilling ways could be worked on this rig, such as DTH drilling, anti-air circulation drilling, anchor drilling, rotation drilling, and follow-down drilling, as well as core drilling.
5. Low operation cost,Down the hole drilling for rocks has the lowest drilling cost with highest level of working productivity.
6. Crawler chassis with long stroke jack cylinders,Long stroke jack cylinders are easy for truck self loading during transportation, and crawlers are of better mobility in mud working sites.
7.Adjustable feeding pressure to get the best feeding force at various drilling depths.
NL 180 Water Well Drilling Rig FAQ
Q 1: What kind of drilling rig do you have?
A: We mainly produce small hydraulic drilling rig, water well drilling rig, core drilling rig, engineering drilling rig, geological exploration drilling rig, etc., and we will recommend the suitable model according to your exact requirement .
Q 3: Are you a manufacturer or a trading company?
A:We are a 20 years professional manufacturer with ISO certificate. We have a large modern drilling rig plant in Hebei, China.
Q 4: How long is your delivery time?
A: Small hydraulic drilling rigs generally take 5-7 days, and large pneumatic water well drilling rigs generally take 7-15 days. If there is an urgent order, please contact our sales in advance.
Q 5: How long is the warranty of your well drilling rig?
A: Except for consumable spare parts, the whole machine shall be one year.
Q6: How long can your air compressor be used?
A: Normally more than 10 years.
Q 7: What are the terms of payment?
A: TT, Western Union transfer.
Q8, Can you provide us with the documents for customs clearance?
A: Of course. We will send you commercial invoice, sales contract, packing list, bill of lading (FOB or CFR, CIF terms), insurance policy (if CIF terms), and certificate of origin if you need it
Q9: How is your customer service?
A: 24-hour online service. The 48 hour problem was solved (except in special cases).
Q10: How about your after-sales service?
A: 1. Provide customers with online installation and commissioning instructions.
Well trained engineers can serve overseas. (non epidemic impact)
How can we do a good job in the maintenance of well drilling rig?
1. Pay attention to check whether the bolts and nuts of water and gas pipelines and various accessories of the drilling rig are firm at any time
2. . Always check the lubricating oil condition of the wind motor
3. . When the working face is immersed in water, a large-diameter drill head shall be used to insert the drill pipe when opening the hole, so that the drill pipe is 1-2 meters above the water surface to prevent mud and rock slag from falling into the hole
4. . The drilling rig is not allowed to reverse during drilling operation, so as to prevent the drill pipe from falling into the hole
5.. When the drilling rig stops working for a short time, a small amount of air pressure shall be given to prevent sediment from invading the interior of the percussion device of the drilling rig. If the drilling rig stops working for a long time, the percussion device shall be lifted 1-2m away from the hole bottom for fixation