Hebei Nailiang Machine Equipment Co., Ltd.
|
Price: | 6800.0 USD |
Payment Terms: | T/T,L/C,D/A,D/P,WU,Paypal,Money Gram |
Place of Origin: | Hebei, China (Mainland) |
Add to My Favorites | |
HiSupplier Escrow |
Mining Core Drilling Machine Full Hydraulic Crawler Engineering Drilling Rig
GK 200 Engineering Drilling Rig Introduction
Diesel drilling machine: fast drilling speed, time-saving and labor-saving, convenient to carry, easy to operate,high quality and low price, economical and practical, it is a product in well drilling, piling and drilling equipment
GK 200 Customized Engineering Drilling Rig Technical Data
Drill rig specification | |
Drilling depth | 200m |
Drilling Diameter | 91mm,110mm,130mm,150mm,300mm |
Drilling rod diameter | 50mm |
Drilling Angle | 90°-75° |
Dimensions(L×W×H) | 1750×850×1300 (mm) |
Weight | 880kg/set |
Swivel Head | |
Spindle Speed | 115, 230, 505, 790, 1010 r/min |
Spindle stroke | 450mm |
Spindle Dia. | Φ59mmx53mmx4350mm Kelly rod |
Upward displacement speed of drilling vertical spindle | 0.05m/s |
Downward displacement speed of drilling vertical spindle | 0.067m/s |
Spindle pull-down max | 15KN |
Spindle lifting capacity max | 25KN |
Vertical maximum output torque | 1.5KN.m |
Hoist | |
Max. Lifting capacity(single rope) | 20KN.m |
Lifting rotating speed | 20; 40; 90; 168r/min |
Hoisting drum linear velocity (two levels) | 0.17; 0.35; 0.73; 1.5m/s |
Drum Diameter | 140mm |
Wire rope diameter | 9.3mm |
Wire rope capability | 40m |
GK 200 Customized Engineering Drilling Rig Features
1.Wide range if P.R.M and well-set gears
2.Great torque in low P.R.M, fit for coring drilling and piling hole works.
3.Mobile cylinder installed so that the drilling machine got a free travel of 300mm, ensured easy remove of drilling stem.
4.Easy to handle, high efficiency, oil hydraulic drive, low labour intensity.
6.Optimized structure, small volume, and lightweight.
What aspects should be paid attention to in the drilling process of water well drilling rig?
After the drill bit is drilled into the structure from the drilling platform, the central drilling tool shall be replaced in time. First, you need to clean the bottom of the hole, and then blow off the residue at the bottom of the hole. When the lifting force is sufficient to lift the drill bit, slow lifting force is good.
During the drilling process, the drill bit was summarized, the follow-up situation of the casing was noted, the specific situation of the borehole was determined within a certain time, the borehole was kept clean in time, and the drill bit was put into the drill. You need training. During this process, forced lifting is prohibited.
Sometimes, there will be a lot of residual rock slag at the bottom of the hole of the water well drilling rig, and the rotary part of the eccentric drill bit will be stuck by the rock slag, which will affect its gathering and production. At this time, it is necessary to convey compressed air to clean the hole again, and make the DTH hammer work for a short time, and then carry out the lifting operation of the central drilling tool again.