Post Offer Free
Hebei Nailiang Machine Equipment Co., Ltd.

China Geological Exploration Hydraulic Drilling Rig manufacturer

1st

Gold Index: 58772

You are here: home  > Engineering Drilling Rig  > Geological Exploration Hydraulic Drilling Rig

Geological Exploration Hydraulic Drilling Rig 

Price: 6800.0 USD 
Payment Terms: T/T,L/C,D/A,D/P,WU,Paypal,Money Gram 
Place of Origin: Hebei, China (Mainland) 
inquire
Add to My Favorites
HiSupplier Escrow
Share |

Product Detail

Means of Transport: Ocean,Land,Air
Packing: Standard Export Package
Price :: Negotiation
Supply Ability :: 2000 sets per year
Power Type :: Diesel
Drilling depth: 150 Meters
Rated Boring Diameter: 200m
Production Capacity: 20000 sets per year
Delivery Date: Within 7-15 days
Payment Terms :: T/T, Western Union
Packaging Details :: Standard Export Package
Weight: 626KGS
Voltage: 380V

The dilling rigs are widely used in water well drilling, geological exploration, construction building exploration, river dam construction

100m Geological Exploration Hydraulic Engineering Drilling Rig



XY-1 Water Well Drilling Rig Information


XY-1 Small hydraulic core drilling rig is a kind of small-scale sampling and drilling equipment widely used in plains, mountainous areas and areas with inconvenient transportation and energy. It has the advantages of compact structure, small occupied area, light weight and convenient movement. It is suitable for geological sampling exploration, geological core drilling, small grouting holes, blasting holes, grouting holes, etc. in railway, water conservancy, water wells, construction projects and outdoor mountain areas. Diamond, composite and alloy bits can be selected for drilling according to different formations.


XY-1 Water Well Drilling Rig Technical Data


DrillSwivel Head

Drilling depth


Max.130m

Spindle speed


1010,790,470,295,140(r/min)

Hole diameter


Max.130mmSpindle stroke450kmm
Drill rod diameter42mmSpindle pull-downMax.15KN
Angle range90-75Spindle lifting capacityMax. 25KN
Oil pumpWater pump
ModelYBC-12/125ModelHorizontal reciprocating single-acting piston pump
Rated pressure12.5MpaWorking pressureMax. 1.25Mpa
Flow speed8ml/r

Rated speed1500r/min

HoistPower(diesel)
Max. lifting capacity15KNModel(diesel engineZS1105
Hoisting drum revolution

121,76,36(r/min)


Rated power12.1KW
Drum diameter140mmRated speed2200r/m
WEIGHTAROUND 600KG
SIZE1620*970*1560mm


XY-1 Water Well Drilling Rig Main uses:


◇ engineering investigation ◇ geophysical and geochemical exploration drilling sampling ◇ advanced drilling

◇ drilling and grouting ◇ pilot holes of embedded parts ◇ various blasting drilling ◇ inspection holes

◇ small household water wells ◇ regional geological survey ◇ mine vein exploration

◇ ore grade evaluation ◇ geotechnical engineering detection


XY-1 Water Well Drilling Rig Features


XY-1 drill rig is used to survey and exploration, geophysical prospecting, road and construction exploration, punching blastinghole, etc.

Used for general investigation, geophysical exploration, high-way and building construction, and blast-hole drilling etc.
1. With hydro-automatic feeding device, and high drilling efficiency.
2. Designed with hydro-chucking unit instead of slips to ensure drilling from stop when changing pipes.
3. Close levers, convenient to operate, safe and reliable operations.
4. Compact in structure. All the drill, water pump and diesel engine installed on one base frame result in space-saving.
Light in weight, easy disassembling for transportation and applicable to working conditions in plain and mountain areas

What is the construction technology of de watering well?


Well point measurement and positioning → hole digging and casing embedding → drilling rig in place → drilling → hoisting well pipe → back-filling filter material (coarse sand or gravel) between well pipe and hole wall → hole washing → drainage pump in well pipe and installation of pumping control circuit → trial pumping → normal operation of well point → de watering completion, pipe pulling → well sealing.


The de watering shall be carried out 20 days before the excavation of the foundation pit, so as to drain the stagnant water in the stratum in advance, reduce the groundwater level, improve the self stabilization capacity of the soil layer, and smoothly carry out the anhydrous operation. During the de watering operation, the water level observation of each well shall be done well, and the change of the head of the confined aquifer shall be mastered in time

Engineering Drilling Rig Geological Exploration Hydraulic

bigPhoto
 Mr. jilei

Tel: 86-311-66792900
Mobile: 186 3307 4135
Contact to this supplier

Didn't find what you're looking for? Post Buying Lead or contact HiSupplier Customer Service Center  for help!

Related Search

Find more related products in following catalogs on Hisupplier.com

Other products from this supplier

Company Info

Hebei Nailiang Machine Equipment Co., Ltd. [China (Mainland)]


Business Type:Manufacturer
City: Shijiazhuang
Province/State: Hebei
Country/Region: China (Mainland)

You May Like: