Post Offer Free
Hebei Nailiang Machine Equipment Co., Ltd.

China 200 Meters Gold Mining Core Sampling Machine manufacturer

1st

Gold Index: 58772

You are here: home  > Engineering Drilling Rig  > 200 Meters Gold Mining Core Sampling Machine

200 Meters Gold Mining Core Sampling Machine 

Price: 6800.0 USD 
Payment Terms: T/T,L/C,D/A,D/P,WU,Paypal,Money Gram 
Place of Origin: Hebei, China (Mainland) 
inquire
Add to My Favorites
HiSupplier Escrow
Share |

Product Detail

Means of Transport: Ocean,Land,Air
Packing: Standard Export Package
Price :: Negotiation
Supply Ability :: 2000 sets per year
Power Type :: Diesel
Drilling depth: 150 Meters
Rated Boring Diameter: 200m
Production Capacity: 20000 sets per year
Delivery Date: Within 7-15 days
Payment Terms :: T/T, Western Union
Packaging Details :: Standard Export Package
Weight: 626KGS
Voltage: 380V

The dilling rigs are widely used in water well drilling, geological exploration, construction building exploration, river dam construction

GK 200 Core Engineering Drilling Rig Information


It is a kind of hydraulic feed drilling rig, which has the characteristics of large power, large lifting force and large transmission torque. It is suitable for geological exploration, geological core drilling, small irrigation holes, blasting holes and small water wells of railway, water conservancy, bridge, dam foundation and other buildings. The drilling rig is light in weight, strong in decomposition, easy to move, and suitable for work in plain and mountainous areas.


GK 200 Core Engineering Drilling Rig Technical Data


Drilling depth200m
Drilling Diameter91mm,110mm,130mm,150mm,300mm
Drilling rod diameter50mm
Drilling Angle90°-75°
Dimensions(L×W×H)1750×850×1300 (mm)
Weight880kg/set
Spindle Speed115, 230, 505, 790, 1010 r/min
Spindle stroke450mm
Spindle Dia.Φ59mmx53mmx4350mm Kelly rod
Upward displacement speed of drilling vertical spindle0.05m/s
Downward displacement speed of drilling vertical spindle0.067m/s
Spindle pull-down max15KN
Spindle lifting capacity max25KN
Vertical maximum output torque1.5KN.m


GK 200 Engineering Drilling Rig Advantages


1.With hydraulic feeding device, elevated drilling efficiency, reduced labor strength.
2.The rig is equipped with an upper spherical jaw holding mechanism and hexagonal drive drilling rod which can be replaced without
shutdown, high efficiency, safe and reliable.
3. A hole bottom pressure gauge is mounted indicating the pressure in order to control the status inside the hole.
4.Compact structure, small volume, lightweight, high detachability, easy transportation and suitable for the operations in plains


GK200 Engineering Drilling Rig Applications


1. Drillings for the general exploration and investigation of solid mineral deposit, engineering geotectonic survey a
2.Diamond drill bit, alloy drill bit and steel roller drill bit and so on are available for drilling according to different geological structures.
3.When the final holes are respectively 75mm and 46mm in diameter, the rated hole depths are separately 100m and 180m. The maximum
of depth may not exceed 110% of that drilled in each hole. The maximum allowable hole diameter is 150 mm.


The main causes of drill pipe fracture


1, The bending moment of drill pipe is too large during reaming and pipeline pullback;

2, The causes of excessive bending moment are as follows: first, the actual curve of the guide hole deviates greatly from the theoretical curve; Second, the hole after reaming is irregular, which makes the pipe form an angle with the reamer and the drill pipe axis.

Other reasons:

1, In order to save investment, the directional drilling equipment used by the construction contractor (i.e. Party A) does not match the actual needs of the project construction. The tonnage of the directional drilling equipment is too small, the maintenance is not timely, and the failure rate is high, which makes the directional drilling force uneven. At the same time, the stop and go construction makes the hole forming quality poor, the hole irregular, the drilling tool is easy to lock, resulting in the fracture of the drill pipe;

2, The selection of reamer model is unreasonable. Failure to select the matching rule model according to the actual geological conditions, resulting in increased drilling torque, increased drill pipe wear and fracture;

3, When the rock reamer reams or cleans the hole, the drill pipe is not connected at the back, and the reamer swings greatly in the hole, which may cause the drill pipe and the main shaft of the reamer to break;

 Engineering Drilling Rig Gold Mining Core Sampling Machine

bigPhoto
 Mr. jilei

Tel: 86-311-66792900
Mobile: 186 3307 4135
Contact to this supplier

Didn't find what you're looking for? Post Buying Lead or contact HiSupplier Customer Service Center  for help!

Related Search

Find more related products in following catalogs on Hisupplier.com

Other products from this supplier

Company Info

Hebei Nailiang Machine Equipment Co., Ltd. [China (Mainland)]


Business Type:Manufacturer
City: Shijiazhuang
Province/State: Hebei
Country/Region: China (Mainland)

You May Like: